Monday, October 17, 2005

New cultural hall flooring

The roof of this stake center leaked. When the building became the command post for the work crews they covered the floor with blue tarps and stored wheelbarrows and tools inside. We also watched the BYU-CSU game in this room Saturday night. Go Cougs! Posted by Picasa

0 Comments:

Post a Comment

<< Home